An experienced graduated Mechanical Engineer with approx. 14 years of hands-on experience in managing and optimizing engineering and utility/facility management services, encompassing hard, soft, and specialist services, to drive significant cost savings, ensure optimal operational efficiency, and maintain compliance with regulatory requirements.
Proficient in project management, with the ability to tailor projects to align with specific requirements, limitations, and international standards, all within allocated budgets and without compromising on quality.
I’ve worked with major nationals as well as contracting companies i.e. Education, FMCG, Manufacturing and Health care Industry. In addition to my experience, I’m a quick learner with strong analytical thinking skills seeking a career position where my knowledge and skills can be utilized for the development of my career as well as of an organization.
1. Monitor operation and maintenance works, including Mechanical, Electrical, Plumbing, HVAC, Process Pumping, Septic Water Tanks, Water Wells, and Firefighting Systems.
2. Ensure compliance with manufacturer requirements and client-issued PPM schedules and maintaining effective reports, including audit preparations and checklists.
3. Responsible to oversee construction and building renovation projects to improve efficiency and to ensure that facilities meet environmental, health, and security standards and comply with Govt. regulations.
4. Responsible to enable high performance operation & maintenance, providing asset maintenance according to manufacturer strategy.
5. Responsible to provide administrative and technical support to client and ensure compliance with international standard and other regulatory requirements.
6. Lead and mentor a multidisciplinary team of engineers, supervisors, and draftsmen.
7. Evaluate and plan project resource requirements (materials, machinery, manpower) to ensure timely availability and mobilization.
8. Responsible to implement cost-saving initiatives in facilities & building maintenance and track expenses.
Ongoing Project:
1. Leading the MEP works for the New EGI, Seefam Head Office project at Q-Tower, Plot# 28 College Road, Gulberg, Lahore.
1. Monitored service teams deployed at various sites across Pakistan, ensuring compliance with Service Level Agreements (SLAs) and contractual obligations.
2. Responded to and resolved complaints raised against contracts in a systematic and professional manner, ensuring proper follow-up correspondence and manual customer satisfaction surveys.
3. Conducted quality assurance site visits of ongoing projects and material inspections, ensuring compliance with project specifications and standards.
4. Proactively supervised the closure of Non-Conformance Reports (NCRs), suggesting innovative ideas for improvement.
5. Reviewed project drawings and successfully managed commissioning, coordinating effectively between clients and contractors.
6. Supervised MEP works, ensuring quality standards and approving commissioning plans in accordance with project guidelines.
7. Successfully managed testing and commissioning processes, motivate specialists to achieve standard results.
8. Successfully identified and addressed commissioning deficiencies and errors, ensuring timely project completion.
9. Responsible to prepare and submitting all handover documents such as built drawings, operation & maintenance manual, commissioning reports and testing/balancing reports to client and finally obtaining a completion certificate from clients.
10. Evaluated team member performance quarterly, selected top performers, and tracked progress through regular meetings, emphasizing adherence to safety protocols.
1. Monitored operation & maintenance works which included Mechanical, Electrical, Plumbing, Medical Gases, HVAC, Water Softener plant, Process Pumping, septic water tanks, water wells and Firefighting system across the hospital in compliance to the PPMs issued by the client and ensuring all effective report work including all auditory preparation and checklists.
2. Responded to, and resolved complaints raised by occupants in a systematic and professional manner, ensuring follow-up correspondence and manual customer satisfaction surveys.
3. Responsible to review the maintenance routine for each utility & facility system and ensured the routines are sufficiently detailed to maintain the performance of the system based on the equipment supplier recommendations or operational experience.
4. Responsible to carry out repairs and fixed any defects which appeared in the project, so that, at the end of the agreement, the project is in the condition required by the contract.
5. Planed the need and feasibility of minor additions, modifications and alterations to existing facilities as and when required.
6. Participated in designing modifications to ensure desired goals were achieved, collaborated with technical staff to diagnose and troubleshoot technical issues, and provided technical solutions and advice to management on various design issues.
7. Responsible to monitor inventory, checked upcoming spares & ensured that they’re compliance with the specifications required.
8. Responsible to coordination with other contractors, vendors, and client for the purpose of cooperation and execution of project.
9. Resolved complaints/engineering issues addressed site requirement and ensured timely supply of deliverables from vendors.
10. Served as liaison with management and kept them updated about the progress of ongoing works.
11. Counseled and trained staff on operation and maintenance activities of the system.
Completed Projects
1. ▪Project lead for complete MEP works of phase 1&2; DLP also and successfully handed over to the client.
1. Monitored electrical, mechanical and facility operation & maintenance of the hospital i.e. HVAC, refrigeration, water treatment, medical gases, plumbing, firefighting, generators, water softeners, heat exchanger, process pumping, kitchen equipment, ice machines, walkway freezers and cold rooms etc. The goal was to maximize the property asset value.
2. Provided administrative & technical support to departmental operations and ensure compliance with international standard & other regulatory requirements.
3. Administered all MEP works, troubleshooting, repairs and maintenance of utilities equipment as per manufacturer that met environmental protection requirements within appropriate codes.
4. Ordered material for inventory management with the coordination of store as well procurement and completed work assignments on time and by a specified date.
5. Monitored outside contractors jobs under department. Also, supervised and motivated under staff for O&M and training.
6. Reviewed MEP design documents, provided technical guidance and support to project team where required.
7. Analyzed existing system conditions, conducted performance testing and inspections as per industry standards, and assisted subordinate employees in resolving work problems in a timely manner.
8. Maintained comprehensive records of materials, labor costs, and maintenance activities, generating reports and correspondence relative to work to support statistical analysis and future reference.
9. Managed budget and cost management of facility. Also, Analyzed & evaluated SLA & execution plan.
10. Provided enhancements to all conservation programs for electricity and natural gas.
11. Implemented a CMMS to improve maintenance tracking, increased operational uptime by 18%.
12. Launched a proactive preventative maintenance schedule, reduced system failures by 40%.
13. Maintained liaison with regulatory bodies to control extenuating situations, attended regular meetings to discuss key issues, ensured EHS compliance in maintenance activities, and undertook additional tasks as assigned by the HOD.
Completed Projects
1. Project lead for complete HVAC design, installation & commissioning of C-block (DFA: 900TR, Pluming), E-Block (AWC: 405TR), A-block (AWC: 405TR), H-block (VRF: 60TR), Café (VRF: 135TR), Pharmacy and infectious cold room etc.
1. Monitored, troubleshot, and maintained the operation and maintenance of all kinds of utilities equipment, as per manufacturer recommendations and according to the EBM strategy. This included HVAC, refrigeration, water treatment, plumbing, water softeners, mini boilers, heat exchangers, cold rooms, freezer rooms, plant electrical panel ACs, IT data center ACs, UPS, office ACs, oil-free air compressors, building lifts, and SNG plants. Ensured maximum availability of utilities to facilitate production.
2. Responsible to conduct health assessment surveys for critical equipment.
3. Executed of preventive and corrective maintenance jobs.
4. Responsible to carry out RCA of maintenance requests to minimize re-occurrence.
5. Reviewed utilities consumption and strived to minimize costs.
6. Implemented maintenance check list of all plant equipment ensured zero breaks down.
7. Responsible for in time acknowledgment of spares & consumables to the concerned & proper follow-up.
8. Detailed knowledge of tender document includes the scope of work, technical submittal, value engineering, BOQ and drawings.
9. Prepared of project implementation schedules. Also, active participation in WCM activities.
10. Monitored contractors doing projects under department. Kept HOD Utilities, informed of progress.
11. Responsible the effective implementation of HACCP, QMS, SOPs, hygiene, PPEs and EHS at shop Floor all the time.
1. Monitored operation & maintenance activities of utilities such as HVAC, Fire-fighting, Plumbing and Air-Compressor system as per manufacturer's instructions and established SOPs.
2. Monitored for engineering installation, maintenance and troubleshooting of various stretch blow molding, extrusion blow molding, in-mold labeling and plastic injection molding machines etc.
3. Detailed reviewing of design report, working drawings, BOQ and technical submittals.
4. Inspected of upcoming material and equipment as per BOQ.
5. Prepared project implementation schedules and official procedure of all type of tender work.
6. Estimating MEP system and do actual surveys and examinations to the place to be considered.
7. Cross checked of equipment submittals from subcontractors and suppliers prior to procurement.
8. Coordinated with the contractors for work quality assurance and to complete the job as per schedules.
9. Conducted internal weekly meeting to resolve the issues and upcoming challenges.