خلاصہ

At Clinker Silo Discharge
Erection of new Cement line 7700 TPD of power Cement pvt ltd Noriabad with FLSmidth Denmark.
Key Areas to be Responsible for
Pre Assembly and Erection of Bag filters.
Erection of Belt conveyors,Drag chain conveyor,Silo discharge units,Piping of compress air reciever,Screw conveyor.
Do regular inspection during installation with Clients.

تجربہ

کمپنی کا لوگو
Site Engineer
Tianjin Electric power construction
دسمبر ۲۰۱۸ - جنوری ۲۰۲۰ | Jamshoro, Pakistan

i worked in Power cement ltd Noriabad with contractor Tianjin Electric power construction at Clinker Silo.
Erection of new Cement line 7700 TPD of power Cement pvt ltd Noriabad with FLSmidth Denmark.
Key Areas to be Responsible for
Pre Assembly and Erection of Bag filters.
Erection of Belt conveyors,Drag chain conveyor,Silo discharge units,Piping of compress air reciever,Screw conveyor.
Do regular inspection during installation with Clients.

کمپنی کا لوگو
Internship
Wapda Thermal Power Plant GENCO 2
اگست ۲۰۱۷ - اکتوبر ۲۰۱۷ | Guddu, Pakistan

I had learn about Gas turbine and Steam turbine.
I also had a internship in HVAC Water chiller system

تعلیم

khawaja fareed university of engineering and information technology Rahim Yar Khan
بیچلرز, , B's mechanical engineering‎
Thermodynamics, refrigeration, manufacturing, powerplant, Engineering drawing
CGPA 2.6/4
2018

پیشہ ورانہ مہارتیں

ابتدائی Field Task Management
ابتدائی Handling Assignments
ماہر Mechanical Engineering
متوسط Metallurgical Skills
متوسط Official Assignment
متوسط Record Keeping

زبانیں

ماہر پنجابی
متوسط سندھی
ماہر اردو
متوسط انگریزی