خلاصہ

To work in an organization that provides me with ample opportunities to enhance my skills and knowledge along with contribute to the growth of the organization. I want to contribute my expertise and working experience to the growth of the organization. I worked not only in UN System but also served with government departments and always achieved the targets and goals as required. I am always a good team player.

I am a Civil Engineer and working as Head of Engineering Wing at RESPAK PVT LTD.

پراجیکٹس

Residential Block, at PA academy
Joint Police Training Center Nowshera KPK

تجربہ

کمپنی کا لوگو
Principal Engineer
RESPAK PVT LTD
جنوری ۲۰۲۱ - موجودہ | Peshawar, Pakistan

کمپنی کا لوگو
Engineering Specialist
United Nations Pakistan
جنوری ۲۰۱۲ - دسمبر ۲۰۲۰ | Peshawar, Pakistan

- manage and supervise a team of project engineers, architects and consulting team engaged for the infrastructure development projects of the UNDP Rule of Law Programme for the last 8 years.
- ensure effective construction projects planning and Implementation.
- build working partnership and establishing coordination mechanisms with the government, contractors and donors.
- prepare periodical reports for the UNDP and donors, i.e. weekly, monthly, quarterly, bi-annual, annual and project completion reports.
- provide technical assistance and to the UNDP and Rule of Law senior management on matters relating construction projects of Rule of Law Programme and other UNDP projects under different units of UNDP CO Pakistan.
- prepare construction projects plans and follow ups to timey complete Rule of Law Programme construction projects programme provinces in Pakistan.
- provide practical advice to the programme, operations, finance and procurement teams on day to day basis to ensure smooth implementation of construction projects.
- ensure implementation of UNDP construction and procurement rules and procedures in all construction projects.
- manage construction companies and design and supervision firms / companies to ensure UNDP and donors requirements are fulfilled.
- maintain cordial relationships with the end- user, i.e. police, anti- narcotics force, prosecution, prisons, planning and development department, judiciary, etc. through quality work.
- prepare budget and assessment i.e. feasibility studies, scope of work for new construction projects, project proposals, concept note, etc
- proper and regular monitoring and site supervision of all construction projects and deployment of engineering team to complete the construction projects within quality manner.
- perform as part of technical working groups, advisory panels for construction projects, perform as panel members for evaluation of construction projects bid proposals.
- prepare bill of quantities, quantity surveys, third- party structural evaluations.
- identify new areas for engagement and incorporating ideas of green projects, flood resilient building.
- placement and implementation of oversight mechanisms safety and health protocols and procedures and protocols.

Achievements:
• completion of joint police training college Nowshera US Govt. largest law enforcement infrastructure project in South Asia. 10.75 Million USD
• completion of 4 agriculture training centers to eradicate poppy cultivation in Merged Districts. 1.5 Million USD
• completion of anti – narcotics force women barrack Islamabad. 1.87 Million USD
• completion of police training college Quetta, i.e. multi-purpose hall and two academic buildings. 6.75 Million USD
• completion of 5 model police stations in Merged Districts. 4.75 Million USD
• completion prosecution academy Peshawar. 1.5 Million USD
• establishment of regional forensic science laboratory in Swat. 1 Million USD
• rehabilitation of court rooms in seven districts of Malakand. 1.2 Million USD
• conversion of 65 police into model police station in KP with gender desks in all stations. 1.15 Million USD
• establishment of child day care facilities for more than 80 children and residential areas for women. 0.67 Million USD
• construction of female bar rooms in three districts of Malakand, Swat, Chitral and Malakand. 0.5 million USD.
• 1000 of small refurbishment project at Central Police office, Home Department, High Court Peshawar, Election Commission.

کمپنی کا لوگو
WATSAN and Technical Coordinator
ERRA. Prime Minister’s Secretariat (Public)
جنوری ۲۰۰٦ - دسمبر ۲۰۱۱ | Islamabad, Pakistan

• Co-ordination. The Work include management and administrative duties and Co-ordination with other members of the Project, with staff of other partner organizations and line agencies.
• Prepare & update implementation program in coordination with DG SERRA and Director WATSAN ERRA.
• Constructional Supervision of all ongoing project of GOP funded as well as Sponsor Project.
• To report regularly, verbally and in writing to the Director WATSAN and WATSAN Advisor to represent ERRA & line agencies and Government authorities where requested.
• Monthly Progress reports about project to Head Office, Islamabad.
• Checking all on going project, their progress, also check and rationalize all PC-1, BOQ’s, Tender Documents related to WATSAN.
• Provide feedback to the Monitoring and Evaluation system in order to asses the effectiveness of the projects and impact and propose recommendations for improvements.
• To organize all activities related to the implementation of WATSAN programs including water supply schemes, Solid waste management, Sanitation, Buildings, streets, drainage line and infrastructure projects, from check design to implementation, including logistics and monitoring. Responsible for the identification, design, implementation, monitoring and reporting of all water supply and sanitation program activities and associated administrative tasks on the ERRA/SERRA Support Program in the assigned districts of AJK. To supervise all water and sanitation engineering staff in order to effectively implement planned projects. To manage all administration and security of ERRA , SERRA engineering activities in the assigned districts.
• Major Project:
• Monitoring and Supervision: 2282 water supply Schemes all over AJK (Muzaffarabad, Rawalkot, Bagh, Neelum). Including Pc-1 , PC-2 , Tender Documents, TOR, BOQ of different departments (Local Government & Rural Development Department, Public Health Engineering Department , Municipal Corporation , Town Committees.
• Government Buildings : all the Government building of (Local Government & Rural Development Department, Public Health Engineering Department , Municipal Corporation , Town Committees which were destroyed / damaged are under my supervision for reconstructed/ rehabilitated. Finalization of their Budgets, PC-1 and Tender Documents.
• Solid Waste Management : due to earthquake all the systems of SWM badly damaged, feasibility study PC-1 and tender document of SWM is Supervised and further there approval is done by me.

To provide technical support to SERRA to manage and coordinate ERRA’s water supply and sanitation (WATSAN) program in the respective earthquake affected areas.
• Prepare technical reports, and monitor implementation of public/community owned water supply and sanitation (WATSAN) schemes.

• Ensure that the programme is implemented in a consultative, participative and effective manner.
• To help the concerned line departments in preparation of annual work plans /PC-1s in accordance with the sectoral strategy formulated by the Earthquake Reconstruction and Rehabilitation Authority (ERRA).
• Ensure that budgetary and programmatic aspects of current and future schemes are compliant with ERRA’s guidelines.

• Carry out effective monitoring of the project’s activities, quality achievements and shortfalls as well as beneficiaries feedbacks.

• Ensure effective implementation of all the WatSan components (hard and soft ), particularly regarding Water quality and Hygiene promotion.

• Assist the respective program manager/DG (SERRA) in regular reporting to the concerned quarters.
• Assist SERRA to develop and support community engagement and ownership in the WATSAN and SWM programme and to engage and mobilize target communities on the benefits of the safe hygiene practices to maximize programme coverage.

• Assist in government’s efforts to bring about behavioral changes in favor of safe hygiene practices.

Work in close collaboration with partner organizations, line departments / agencies to ensure that all interventions are appropriate to and compatible with local needs / sectoral strategy and designed to ease the burden and protect the health of the earthquake affected people.
Coordinate the work of WATSAN coordinators at DRU level by consolidating, monitoring and supporting the DRU level work plans and progress reports
To Provide technical support in designing, preparing, implementing, monitoring and evaluating Water and Sanitation Projects ( Good command on water supply and sewerage system design, along of huge experience of implementation of such projects in Government and private sector , working in water and sanitation sector from Feb 2006 in Earthquake effected Areas).

I also analyse and evaluate data to ensure achievement (duplication, verification, proper designing and developed report sheets to ERRA and Secretary LGRDD) to achieve the objectives and recommend corrective action when necessary to meet project objectives. Assist in the development and introduction of new approaches, methods and practices in water supply and sanitation management and evaluation. (The duplication, verification, lists, detail report of UNICEF AJK were accessed and prepared by me)

Assessment of all field level data and project activities, including program review at ERRA and SERRA level as well as with Chief Secretary and Additional Chief Secretary in progress review meetings. Got a good command on project management and planning. At the moment I am controlling five earthquake effected districts (Neelum, Bagh, Poonch, Muzaffarabad and Suhnoti), three District Reconstruction Units (Muzaffarabad, Poonch and Bagh) and providing them technical assistance as well as to Public health Engineering Department and Local Government and Rural Development Department. For Water and Sanitation Government of Pakistan Project in AJK in am advisor to Secretary LGRDD and Secretary PP&H , deputed by DG, SERRA and ACS.

As in Water and Sanitation Sector services of Consultant in not hired (only in Building NESPAK are service provider), therefore the monitoring and evaluation along with supervision and top supervision is in my purview. Preparing all the updates tables , data reports, duplication reports, evaluation and case studies in For AJK. Weekly update report for ERRA.

As a State WatSan Coordinator promote different training to build capacity of line departments to take the program forward and to develop there approaches towards clean and clear environment. Also developed water and sanitation new work plan due to which the WATSAN Sector is on fast track now in AJK.

To provide technical support to SERRA to manage and coordinate ERRA’s water supply and sanitation (WATSAN) program in the respective earthquake affected areas.
• Prepare technical reports, and monitor implementation of public/community owned water supply and sanitation (WATSAN) schemes.

• Ensure that the programme is implemented in a consultative, participative and effective manner.
• To help the concerned line departments in preparation of annual work plans /PC-1s in accordance with the sectoral strategy formulated by the Earthquake Reconstruction and Rehabilitation Authority (ERRA).
• Ensure that budgetary and programmatic aspects of current and future schemes are compliant with ERRA’s guidelines.

• Carry out effective monitoring of the project’s activities, quality achievements and shortfalls as well as beneficiaries feedbacks.

• Ensure effective implementation of all the WatSan components (hard and soft ), particularly regarding Water quality and Hygiene promotion.

• Assist the respective program manager/DG (SERRA) in regular reporting to the concerned quarters.
• Assist SERRA to develop and support community engagement and ownership in the WATSAN and SWM programme and to engage and mobilize target communities on the benefits of the safe hygiene practices to maximize programme coverage.

• Assist in government’s efforts to bring about behavioral changes in favor of safe hygiene practices.

Work in close collaboration with partner organizations, line departments / agencies to ensure that all interventions are appropriate to and compatible with local needs / sectoral strategy and designed to ease the burden and protect the health of the earthquake affected people.
Coordinate the work of WATSAN coordinators at DRU level by consolidating, monitoring and supporting the DRU level work plans and progress reports
To Provide technical support in designing, preparing, implementing, monitoring and evaluating Water and Sanitation Projects ( Good command on water supply and sewerage system design, along of huge experience of implementation of such projects in Grovernment and private sector , working in water and sanitation sector from Feb 2006 in Earthquake effected Areas).

I also analyse and evaluate data to ensure achievement (duplication, verification, proper designing and developed report sheets to ERRA and Secretary LGRDD) to achieve the objectives and recommend corrective action when necessary to meet project objectives. Assist in the development and introduction of new approaches, methods and practices in water supply and sanitation management and evaluation. (The duplication, verification, lists, detail report of UNICEF AJK were accessed and prepared by me)

Assessment of all field level data and project activities, including program review at ERRA and SERRA level as well as with Chief Secretary and Additional Chief Secretary in progress review meetings. Got a good command on project management and planning. At the moment I am controlling five earthquake effected districts (Neelum, Bagh, Poonch, Muzaffarabad and Suhnoti), three District Reconstruction Units (Muzaffarabad, Poonch and Bagh) and providing them technical assistance as well as to Public health Engineering Department and Local Government and Rural Development Department. For Water and Sanitation Government of Pakistan Project in AJK in am advisor to Secretary LGRDD and Secretary PP&H , deputed by DG, SERRA and ACS.

As in Water and Sanitation Sector services of Consultant in not hired (only in Building NESPAK are service provider), therefore the monitoring and evaluation along with supervision and top supervision is in my purview. Preparing all the updates tables , data reports, duplication reports, evaluation and case studies in For AJK. Weekly update report for ERRA.

As a State WatSan Coordinator promote different training to build capacity of line departments to take the program forward and to develop there approaches towards clean and clear environment. Also developed water and sanitation new work plan due to which the WATSAN Sector is on fast track now in AJK.

کمپنی کا لوگو
Technical Coordinator
Mercy Corps International
جنوری ۲۰۰۴ - دسمبر ۲۰۰۵ | Bagh, Pakistan

• Implementation of ongoing projects. To Carry out the selection, design and construction of water systems, using ground water or surface water, including abstraction, storage, treatment and distribution for new systems or rehabilitation of existing systems.
• To select, design and implement the most appropriate form of sanitation system, in consultation with the beneficiaries, which includes excreta disposal, refuse disposal, vector control and drainage.
• Ensure that all work is performed in full compliance with standard construction practices, standard operating procedures, work instructions and drawing specification.
• Water Supply Schemes. Construction of new water supply schemes because after earth quake many sources becomes dry and many new sources discovers introduces under ground water supply tanks which can store which should me not cold in cold weather and hot in hot weather. As well as repairs and extension for existing water supply schemes. Work includes Water tanks , stand posts, gravity supply pipe lines, intake tanks.
• Sanitation. Design and implement sewerage system, sewer lines, introduces pour flash bath rooms, with septic tank. Bath room attached with home for security reasons .
• To liase closely with the Public Health Promotion Team throughout the planning, design and implementation stages of the Public Health Engineering Program. Hygiene Promotion is a vital element of such Public Health Engineering Programs
• To assess emergency needs, as requested, especially taking in the broader perspective of Public Health.
• Quality control and assurance on the site
• GPS Survey The survey was conduct to check the locations and discovers new water sources also estimated the populations and house holds, it was also estimated that how many houses are up from the sources and how much are under sources.
• Implementation of ongoing projects. Ensure that all work is performed in professional order, all materials used of standards, as well as how many masons required and how many unskilled labours required per day.
• Construction Supervision Ensure that all work is performed in full compliance with standard construction practices, standard operating procedures, work instructions and drawing specification.
• Community Mobilization about project awareness , what sort of project we are gone do to community, what sort of benefit community can provide us on project. e.g agreements of source , agreements of land on which tanks be constructed etc. what benefit will community gain after project completed.
• To ensure that all Programs take gender issues fully into account. This includes the introduction of mechanisms to enable women to participate in decision making around public health engineering issues.
• Community meets with Village Development Committee’s about projects awareness.
• Preparation & Designing. of Bill of qualities , Technical Specifications, detailed estimates for rising of PR of Materials use in project.
• To ensure that all Programs take gender issues fully into account. This includes the introduction of mechanisms to enable women to participate in decision making around public health engineering issues.
• Design (Earth quake Proof ) Community Halls, Vocational Centers, Water Tanks including Structural , Bar bending Schedules and Foundations.
• Design water schemes , water tanks , intake cambers, Pits, Community halls with earth quake protection also follow the codes of ERRA.
• Review & verification of civil works designer’s drawings/design
• Prepare & update implementation program in coordination with project manager.
• To report regularly, verbally and in writing to the Program Manager or Public Health Engineering Team Leader and to represent Mercy Corps to other NGO’s, agencies and Government authorities where requested
• Monthly Progress reports about project to Head Office.


• Co-ordination. The Work will include management and administrative duties and Co-ordination with other members of the Project and with staff of other organizations.
• Planning of ongoing projects and design approvals.
• Prepare & update implementation program in coordination with project manager.
• To report regularly, verbally and in writing to the Program Manager , Technical Manager and Team Leader and to represent Mercy Corps to other NGO’s, agencies and Government authorities where requested
• Monthly Progress reports about project to Head Office.
• Supervision and monitoring of all ongoing project.
• Budget distribution between WATSAN and Livelihood Infrastructures Project.
• Work plans and target settings.
• Monitoring: of all on going projects, WATSAN Staff and Warehouses. Including all records updating accordingly.
• Checking and Submission of WATSAN bill, Per Day Allowance form of WATSAN Employs, issuing way bills and Purchase of required materials.
1- 6 water supply Schemes, 6 Community Halls, 800 Toilets, 4 Lady health workers Units funded by USAID.
2- 20 Water Supply Schemes, 1400 Toilets, funded by UNICEF.
3- 30 Health Units, 8 Vocational Training Centers and 8 Community Halls funded by SE European Union. All the projects was based in BAGH, AJK Earthquake Affected Area
4- 36 Water Supply Schemes, 1400 Bath Rooms, 30 Health Units, 8 Vocational Training Centers and 2 Community Halls.

کمپنی کا لوگو
Resident Engineer
NWFP Agricultural University.
جنوری ۲۰۰۰ - دسمبر ۲۰۰۳ | Peshawar, Pakistan

• Preparation of PC-1, PC-2, Bill of qualities , Terms of References , Technical Specifications, Tender documents for Client.
• Implementation of ongoing projects. Ensure that all work is performed in full compliance with standard construction practices, standard operating procedures, work instructions and drawing specification
• Layout and Leveling. Ensure the layout on ground is as planned in draws and the depth of excavation is maintained and in level.
• Quality control and assurance on the site
• Bar-bending schedule. Ensure the how much deformed bars gone use and what should be the cutting length, and what quantity required in Tons cross check with contractor bills and detailed estimates, also send deformed bars for laboratory testing.
• Construction Supervision Ensure that all work is performed in full compliance with standard construction practices, standard operating procedures, work instructions and drawing specification.
• Monitoring daily site activities & work programmes to ensure the work carried out on site was as agreed .
• Preparing financial statements and monthly running payments on the site against work being completed. Monitoring the work on site then in drawings to ensure that drawing being followed compare the contractor bills with detailed estimates to ensure that budget is available for that piece of work , then recording all bill after duly verification on MB.
• Water Supply & Over head reservoir. Distribution lines network alone with over head reservoirs. Area covered was 36 Acres
• Sanitation. Design and implement sewerage system, sewer lines, pits, drain lines, septic tanks combining all buildings with main sewerage line & main sewerage line with Treatment Plant etc.
• Project includes, 13 single and Multi Story structures, 3 asphalt internal Road (30 & 20 Ft wide).
Supervision & quality control on subcontractor’s civil work project implementation, 4 over head reservoirs, 8 contractors, 20 C-type houses, 8 B-Type houses, 4 A-Type house, 2 (400 Bed hostels) for boys, 1 (200 Bed Hostel) for girls.

تعلیم

Chartered Institute of Procurement and Supply
سرٹیفیکیشن, CIPS-Level-3‎
Project Management
مکمل
2019
Chartered Institute of Procurement and Supply
سرٹیفیکیشن, CIPS-Level-2‎
Project Evaluation
مکمل
2018
Charted Institute of Procurement and Supply
سرٹیفیکیشن, CIPS Level-1‎
Project Management
مکمل
2016
UNICEF
مختصر کورس, Cluster Coordination‎
Production and Operations Management
مکمل
2010
University of Engineering and technology (UET) , Peshawar
بیچلرز, BSc, B.Sc Civil Engineering‎
Fluid Engineering, Soil Mechanics and Foundation, Structural Design and Analysis
1999

پیشہ ورانہ مہارتیں

متوسط Analytical Skills
ماہر Multiple Projects Handling
ماہر Software Design

زبانیں

ماہر پنجابی
ماہر انگریزی
متوسط فارسی
ماہر پشتو

آپ کن کمپنیز کی پیروی کر رہے ہیں