I am a dynamic and results-oriented professional with experience in electrical engineering, operations and maintenance, installation, commissioning, integration, and troubleshooting of technical and highly valued equipment. Skilled in examining critical situations and executing complex operating, and procedural decisions, always keeping an eye on the end result and ensuring timely completing project. Strongly familiar with the process of maintenance and operations of SML CPP and BOPP Plant with the ability to manage power load demand of plant, load distribution and calculation of cable sizes and panel designing. Possess in-depth Knowledge of BONFANTI conveyors and cranes, parameterizing and commissioning of variable frequency drives and control circuits, sensors, encoders and actuators. Proved instrumental in electrical engineering techniques and principles and executing the maintenance plans and managing inventory in dynamics and SAP S4/HANA.
My key skills include Project Management, Operation & Maintenance, Installation and Commissioning, Troubleshooting, Electrical Inspection, Design Engineering, Strategic Planning & Analysis, Risk Assessment & Mitigation and Analytical Skills
Technical Proficiency: Simatic Manager S7, Lenze, B&R and ABB Drive Control, SIMARIS, Microsoft Dynamics, Hitachi, EATON and Power Flex Drives, Automation Studio, MATLAB, Simulink, Proteus, Altium Designer, Microsoft Office
My professional background and great industrial exposure coupled with an excellent track record makes me an ideal candidate for executive roles. As such I would welcome a discussion regarding opportunities with your organization that fit my background.
Exercise hands-on approach to administer the installation and commission 1.4MW On Grid Hybrid Solar Project with the collaboration of AESL.
Serve as the Project Lead for overseeing the erection and commissioning of a SML CPP Plant with the collaboration of SML Group, Austria.
Expertly handle electrical maintenance of Bruckner BOPP Line (Five Layer Extruder Plant), German, electrical erection and commissioning of automatic conveyor with the collaboration of BONFANTI Group, Italy.
Serve as a project lead in commissioning of Allied CAT Gas Engines CG 170-2.
Evaluate the designs of LV, HT Panels and transformers required for PETPAK and GPAK plant.
Perform series load calculations for size wiring and circuit protection as well as automate firefighting pumps by using pressure switches.
Build, mentor, and manage teams, implement the maintenance plans of machines and develop an inventory database, 5S system in the plant for the first time and plant maintenance module in SAP S4/HANA.