Configuration of Traffic Nodes Series 02p,06p , 20p and Mini-link CN 210 using software Mini-Link Craft
Perform the E1 Rooting from one site to other site
Troubleshooting of Traffic Nodes series.
Media clear for one site to and other site
DCN Configuration
Visit of sites for PAT (Provisional Acceptance)
Solve operation issues on sites
Use the OSS/OMC software
Performed Operation activities
BSS Troubleshooting
Creation of IDB according to site configuration
Site Alarm troubleshooting
LAN WAN configuration
Back office activity perform
All operation soft wear OSS/OMC mange
NEC link configure
Troubleshooting of Traffic Nodes of NEC
• Configuration of Traffic Nodes Series 02p,06p , 20p and Mini-link CN 210 using software Mini-Link Craft
• Perform the E1 Rooting from one site to other site
• Troubleshooting of Traffic Nodes series.
• Media clear for one site to and other site
• DCN Configuration
• Visit of sites for PAT (Provisional Acceptance)
• Solve operation issues on sites
• Use the OSS/OMC software
• Performed Operation activities
• BSS Troubleshooting
• Creation of IDB according to site configuration
• Site Alarm troubleshooting
• LAN & WAN configuration