Professional Experience
Telenro Pakistan
I worked in Telenor Pakistan as CBOM (Cluster Owner) from Sep, 2013 to 31st August 2014.
Responsibility
Responsible of all issue of assigned cluster (CBOM).
Responsible for resolution of quality issues with agreed SLA
Responsible for Sub-Regional OPEX
Responsible for the maintenance of access network locations
Subcontractor management evaluation
Responsible for network rollout expansion activities.
Secure TCH availability, DCR, MPD CSSR above target values of respective Sub-region.
Resolve CRD NOC complaints, worst cells resolution hardware issue rectification as per agreed SLA.
Improve control on preventive maintenance by vendor sub contractors measures through PM score card OAR management.
Supervise and follow-up Telecom Vendor and PI Sub cons for daily issues and outages
Identifying chronicle/recurring faults in BSS network and resolving them in collaboration with NSN MS and CARE.
Monitoring and escalations of Abis fluctuation and down for the earliest rectification by Vendors as per agreed SLAs ed TATs.
Daily TCH availability tracking and follow-up identify and investigate network quality and rectify
Performance degradation issues, field intervention for outstanding and long pending issues.
Weekly frequent and major outages analysis and rectification of root cause by field intervention if required.
New and Pending Worst cells follow-up with NSN and TP RF, Field intervention for long pending cases and outstanding causes
Quality alarm issues follow-up and field interventions for critical issues escalated by NOC Quality team and RF.
BSS Projects related tasks and coordination with project (internal/external) teams and to establish the realization report.
Facilitate OM HQ team for any update and query of South region.
Outstanding issues (Implementation, TXN, NSN and PI related) registration on OAR and follow-ups on BSS issues.
BSC, TRAU maintenance Rehoming of sites
BTS, BSC, TRAU rectification.
Auditing sites.
Telenro Pakistan
I have joined Telenor Pakistan as a Transmission, OM Technician on 14 Nov, 2012
Responsibility
Co-ordination for timely implementation of SDH-Transport Project (installation, testing commissioning) of different Transport Equipment.
Perform quarterly preventive/corrective maintenance to maintain network.
Co-ordination with customers (BSS, NSS, PTCL etc.) for fault identification and rectification. Problem synthesis reporting.
Testing, Technical Trouble shooting / Fault finding and Operation Maintenance
End to End Testing with Analyzers (Testing the E1 and of Exchange to Exchange system side and Exchange side DDF using by SDH PDH Analyzers)
Fiber optical Power testing and connection testing the input output Power (dbm)
Traffic Transfer changes the old E1 and connects to the new E1 transfer all Exchange DDF side.
Expertise in Traffic Re-routing, Capacity handling, Traffic Management and traffic record maintenance of PDH equipment.
Implementation Supervisor, Transmission (Radio) Installation Commissioning and testing
Nokia Siemens Networks Surpass hiT7070, hiT7060 and hiT7035 systems
Expertise in operating of NEC, SEIMENS (LCT, NCT, TNMS Core Client) and T2000, U2000 client).
STM64 Fiber Ring Switching Test.
Follow up of fiber cutes in Regional Metro optical fiber ring.
Prepare node and threat analysis report of DWDM location.
Conduct quality check to ensure standards are strictly followed.
Basic concept of Routing and switches devices.
Ensure Network synchronization connectivity and troubleshooting.
Maintain spares record of Microwave NEC, PDH SDH Spares.
Konnect Holden (Pvt) Ltd
BSS TXN Technician (Sep_2012 to Nov_2012)
Responsibility
Same as under.
People Logic pvt Ltd
BSS TXN Technician (July _2011 to August_ 2012)
Responsibility
Managing multiple team movement for daily OM activities.
Coordination with Back office troubleshooting quality issues, like Hardware, KPI Worst cell issues.
Handling BSS commissioning Software BR 8.0 and BR 9.0 BR 10.
Commissioning of Eltek Rectifier with Win Power Silver 4.0, 5.0, Power Suite 2.1, 2.4.
Commissioning of Power One Rectifier with POW COM.
Have worked on Siemens TRAUS during audio testing troubleshooting to improve sound quality.
Troubleshooting of Siemens TRAUS including PCMSs and PCMAs.
Troubleshooting of Siemens TRAUS including Hit OSN 3500, PCMSs and PCMAs.
Fair knowledge of No audio testing at TRAUs.
Good knowledge of Hit OSN 3500 DDF.
Performed Abis traffic shifting from NEC to Osn3500 independently.
Good knowledge of SRA4 (SDH links) NSN.
NEC backbone basic knowledge of alarm and loop testing.
Supervision and Smooth Completion of Site Acceptance.
Soft Expansion of TRXs Sites.
Have worked on different protection Techniques.
Working on Telenor project of media shifting and media testing.
Loop testing of TXN. Route by E1 Analyzer (Bert Meter) from BSC to target site.
Installation, Configuration and Troubleshooting of Siemens Radio management
(SRAL XD PDH and SDH Systems).
Traffic allocation at Abis interface.
Troubleshooting of NEC NSN Microwave links.
Fair knowledge about different alarms, when and why they generated. Like BER-alarm, ODU-alarm, IDU-alarm etc.
Well Sound on TX power, RSL, alignment attenuation
GEM Activation Alarm Rectification
Nokia Siemens Networks Pvt. Ltd
BSS, OM Technician. (Jan_2008 to July_2011)
Responsibility
Handling BSS commissioning Software BR 8.0 and BR 9.0.
Troubleshooting of Siemens TRAUS including PCMSs and PCMAs.
Supervision and Smooth Completion of Site Acceptance.
Soft Expansion Band Additions of BTS Sites.
Commissioning of Eltek Rectifier with Win Power Silver 4.0, 5.0, Power Suite 2.0, 2.4 Power One.
Installation, Configuration and Troubleshooting of Siemens Radio management
(SRAL PDH and SDH Systems).
Traffic allocation at Abis interface.
End-end Loop/Break testing of media.
Traffic re-routing and fault handling of NEC/NSN microwave.
Crystal Engineering Services Ltd
BSS Technician (Nov_2005 to Dec_2007)
Responsibility
Installation of BTS, and including Outdoor BTS solutions.
Installation of 900/1800 and dual port Antennas with indoor/outdoor RF connectors.
Smooth Installation of Feeder Cables for 7/8 and 15/8.
Installation of MW (SRAL XD) IDU and ODU with Commissioning.
Commissioning of BTS 240XL and Outdoor BTS.
Coordination with NSS, RF Optimization, Transmission and Civil Works.
Field support during Drive Test Alarm Handling.
Commissioning of Eltek Rectifier with Win Power Silver 4.0, 5.0, Power Suite 2.0, 2.4.