项目

Tricon Boston Consulting coorporation wind farm

工作经历

公司标识
Electrical Installation Engineer
Sapphire Wind Power Company Ltd
Jul 2017 - 代表 | Karachi, Pakistan

• Analyzing turbine supervisory control and data acquisition (SCADA) system data and other operating wind farm data.
• Running queries on MS Excell to extract data parameters.
• Energy yield and wind analysis.
• Summarizing turbine performance, production, and availability metrics for use in energy assessments.
• Identifying turbine performance issues, estimating energy losses, and performing statistical analyses.
• Analyzing operations and maintenance (O&M) cost, availability, reliability, and capacity factor trends by wind farms and across the industry.
• Evaluating wind turbine performance upgrades and changes.
• Developing new and improving existing models, analysis techniques, and tools.
• Reviewing the analysis of others and providing constructive feedback.
• Writing technical reports and communicating results.
• Managing multiple concurrent jobs and tasks.
• Ensuring the successful completion of assigned tasks per the agreed upon scope, schedule, and quality.
• Reviewing and analyzing design drawings for new projects.
Electrical Engineer
Professional Objective
To obtain a challenging position in a professional organization, where I can utilize my knowledge and skills for the mutual benefit. I am highly motivated, dedicated and hardworking individual who can work well independently or in a team environment.
Syed Muneeb Ahmed
WOORRKK EEXXPPEERRIIEENNCCEE
EEDDUUCCAATTIIOONN

公司标识
Electrical And Network Engineer Datacentre
MULTINET PAKISTAN PRIVATE LIMITED
Mar 2015 - Jun 2017 | Karachi, Pakistan

Responsible of all Facility & IT Infrastructure, including customer configurations, within the data center environment ensuring all customer server environments are secure, operational and being maintained by 99.999% uptime.

Monitoring & Managing the operations of Data center including:

•Ensuring that Data Center SOPs are followed in day to day operations.
•Ensuring the prior Activity notifications and proper vigilance for any Data Center Activity.
•Level 1 & 2 IT & Power support to all DC emergencies & operational queries.
•Aligning contractors & vendors for faults & emergency queries.
•Supervising Preventive Maintenance of Air-cons, FSS, Gensets, and UPS.
•Ensuring that the Service Level Agreements (SLAs) are being followed accordingly.
•Generating Trouble Tickets for any operational related issues.
•Generating daily Data Center Status Reports & Shift Reports in timely manner.
•Sharing RCA/RFO for any DC mishap.
•Mounting & dismantling of Telecom & IT equipment (including DWDM, SDH, ODF, Servers, SANs, Firewalls, Switches & Routers).
•Laying of power cables, fiber cables & Ethernet cables for Data Center according to TIA-942 standards.
•Providing power feeds, earth, groundings & internet connectivity to the installed racks.
•Provisioning and ensuring the proper functioning of power sources (AC/DC), Fire Suppression Systems, VESDA, UPS, Gensets, HVACs, Air Purifiers, Humidifiers, CRACs.
•Maintaining backup of Access Control Systems, CCTV recordings and Environmental control systems.
•Ensuring that relevant DC environmental parameters are maintained as per standards. (relative humidity, ambient temperature).
•Creating, revising & implementing Standards operating Procedures.

学历

Sir Syed University Of Engg. & Technology Karachi.
学士, 理工学士, Bachelors in Science‎
CGPA 3.0/4
2015

技能

初学者 Coordination Skill's
初学者 Corporate IT
熟练 Import Operations Handling
初学者 Inventory Planning Skills
初学者 MOSFETs
初学者 MS Visio
初学者 OWL
初学者 مبيعات القناة
熟练 تسويق الشركات