I love challenges. From analyzing an engineering problem to designing an appropriate system to solve it, I work enthusiastically with my team. Currently working at a fiberglass pipe manufacturing firm, I've had the honour of representing my country twice at int'l platforms.
-Working at FPI South Asia (Pakistan) for the supply of GRP & GRE Pipe Systems for clientele based in South Asia (Oil & Gas, Water & Sewerage, Energy and Petrochemical)
-Procurement and installation of K&Z Gaskets, Valves, Pumps and supervising multiple installation teams of Fiberglass Reinforced Polyester (FRP) Piping System at various sites throughout Pakistan through local entity; IPTECH
1)
Client: Attock Petroleum Ltd.
Contractor: Al-Tariq Constructors Pvt. Ltd.
Consultant: Zishan Engineers Ltd.
Duration: 2 months (Oct-17 to Nov-18)
Project: Supply & Installation of Fire-Fighting GRE Pipeline at APL Mehmood-kot Terminal as well as APL Shikarpur Terminal and complete supervision at 30 bar.
2)
Client: Pakistan Refinery Ltd.
Duration: 45 days (Dec-17 to Jan-18)
Project: Complete supervision of the installation of DN 200 GRE Fire-Fighting Line at PRL in Korangi, Karachi and successful hydro-test at 16 bar of the entire pipe system.
3)
Client: Pakistan Refinery Ltd.
Contractor: AJC Corporation
Duration: 10 days (Jan-18)
Project: Complete supervision of the installation of DN 150 and DN 100 GRE Fire-Fighting Line at PRL Tank 63 in Kemari Terminal, Karachi with successful hydro-test at 16 bar of the entire pipe system.
4)
Client: SECMC (Sindh Engro Coal Mining Company) & SCA (Sindh Coal Authority)
Contractor: Pak Oasis Industries
Project: Supply and Installation of 50 Cusecs Effluent Channel from Mining Area to Gorano Dam (Unit 02 Thar Coal Field): DN 1200 mm GRP Pipe (Total Length: 40 km)
5)
Client: United Energy Pakistan
Contractor: Halepota & Co.
Project: Multiple Leakage Repair of GRE Yellow Box High-Pressure Pipe 2500 Series at Matli, near Badin UEP Field (Water Injection Line from Mazari Facility)