概要

Projects

Synchronization Project ( Comap Module ) Synchronizes Gas Genset With Diesel Genset and both are synchronizing with 132 KV Energy Source (Wapda).
HVAC System of Power Plant Cooling Tower Installation .
Installation Working of Power Plant Cooling Tower
EXPERIENCE

1st December 2011 Present Sapphire Finishing Mills. (Power Generation )

Plant Capacity 18MW
Plant Detail Jenbacher JGS320 (1MW)5
Cater Pillar 3512 (1MW)3
Cater Pillar 3516 (1.6 MW) 2
Wapda (132Kv) (8 MW)
As A SHIFT INCHARG
Trouble Shooting of Generator
The Schedule and unscheduled Maintenance
Maintenance of Engine 1000 hr 2000 hr
Synchronization with other Source
Work on Air Circuit Breaker, Bus Bar, Feeder Panel, And Auxiliary Control Panel.
Work at low and high Voltage Power Cable, Power Transformer
Maintain update the record of daily operation progress as well as document the section as per routine.
Maintenance of Different Types pumps and motors
Prepare daily and monthly consumption report.
Experience of operation on 500 KW Low pressure steam turbine.
Worked on Parallel operation of Jenbacher Gas Cater pillar Diesel Engines to Wapda (132 kv)

工作经历

公司标识
SHIFT INCHARGE
Sapphire Finishing Mills Limited
Dec 2011 - 代表 | Lahore, Pakistan

TEAM LEADER OPERATION AND MAINTENANCE IN POWER HOUSE.MANAGEMENTAs A SHIFT INCHARG Trouble Shooting of Generator The Schedule and unscheduled Maintenance of Engine 1000 hr 2000 hr Synchronization with other SourceWork on Air Circuit Breaker, Bus Bar, Feeder Panel, And Auxiliary Control Panel.Work at low and high Voltage Power Cable, Power TransformerMaintain & update the record of daily operation progress as well as document the section as per routine.  Maintenance of Different Types pumps and motors Prepare daily and monthly consumption report.Experience of operation on 500 KW Low pressure steam turbine. Worked on Parallel operation of Jenbacher Gas & Cater pillar Diesel Engines to Wapda (132 kv)

学历

Allama Iqbal Open University (AIOU)
学士, 艺术学士, B A (General )‎
Compulsory English- 1 & 2, Education, SEERAT-E-TAYYABA
所占比重 65%
2020
Imperial College of Business Studies Lahore
学士, 技术学士, Bsc Electrical Engineering Technology‎
Power Generation And Utilization, Power Transmission And Destibution, Basic Electronics
CGPA 3.51/4
2019
GOVERNMENT COLLEGE OF TECHNOLOGY LAYYAH
中级/A级, 等级A, DAE ELECTRICAL‎
AC machine, DC machine
所占比重 72%
2011
GOVERNMENT HAIR SECONDARY SCHOOL JAMAN SHAH LAYYAH
大学入学/0级, 科学, Matric (Science)‎
Science
所占比重 74%
2008
GM TARIQ COMPUTER SCIENCE LAYYAH
短课程, COMPUTER COURSE‎
INRER-NET, MS EXCEL, MS WORD
Completed
2008