I bring along more than a decade of experience with an excellent set of leadership skills and commitment, I believe I would make a significant contribution towards the benefit of your company.
I have a highly accomplished career with a clear and traceable record of success in field of Industrial and Manufacturing Engineering. With my graduation degree under my belt from a recognized University (Bahauddin Zakariya University), I am fully capable of running successful Industrial and Manufacturing Engineering Projects and Tasks keeping in view the best practices for smooth operations.
My key skills comprise Excellence In Mechanical Profession , Quality Assurance, Quality Control, Planning, Work executive Activities Coordination, Data Records Documentation, Procedures Updating, Check Lists Development, Team Leadership Report Generation , Records Management , Training Resource Utilization , Progress Monitoring, Client Relations , Reporting , Reviewing , Skill Development / Training , Organization Skills, Communication Skills, Relationship Building, Staff Welfare, Employee Counseling and Team Leadership.
I have been engaged with Pakistan's most reputed Organizations like Descon Engineering and Sui Southern Gas Company Limited - SSGC where I was responsible for spearheading Mechanical Engineering Division Projects implementation and work closely with the Executive management.
Attached is my resume which showcases my progressive experience and successful track record for leading successful initiatives. My professional background and great industrial exposure coupled with an excellent track record makes me an ideal candidate.
To manage the maintenance team to repair the pumps, pipe lines, storage tanks, plate type heat exchangers.
repair jobs of pumps, tanks, pipe lines, strucrures,
office work mean to say budgeting, emailing, MS office work remained the part of my daily job
Worked here for half year and really got a good experience.
QC planing
QC coordination with own team and client
Set targest and achieved targets
NDT activities
Daily and fortnight report writing
making plans and set the targest.. anage the crew as to reduce the stress generated by team for inspections on daily basis.
Worked as lead QA/QC
Maintain the Quality activities. manage the Team and task and set the targets on daily basis to acheive the doal.
To Manage the team and set the daily targets and imememt the QA/QC ASME standard and coordinate while performing NDT
- Leading a Quality Team in Construction of 118 MW CPP Project; implementing standardized contemporary inspection & test program, witnessing high/low criticality rating materials and equipment through all the projects’ phases
- Supervising inspections/quality evaluation of various specialized ASME equipment during engineering, fabrication & welding
- Evaluating compliance of quality system, recording deviations, proposing resolution, verifying & executing corrective action; interacting with clients and attending to their specifications
- Establishing and implementing improvements to existing sample and data analysis techniques; ensuring continuous improvement & quality development process
- Reviewing test packages & witnessing tests; preparing &updating daily test records and technical reports; quality planning for design & construction, quality manual, organization and documentation
- Preparing Welding Procedure Specification, witnessing Welding Procedure Qualification Test and Procedure Qualification Records of various welding procedures & welder performance qualification tests
- Coordinating with NDT team; monitoring the NDT activities and Post Weld Heat Treatment
- Assisting in preparing proposed WPS as well as conducting PQR and after test results Finalizing WPS
- Maintaining nonconformance log; raising non-conformance report and submitting to immediate supervisor
- Monitoring & following up the timely close out of Corrective Action requests (CAR), Preventive Action Request (PAR) and Field Trouble Reports (FTR)
- Carrying out inspections of rotary equipment’s, incoming products, material or customer items as well as involving in pre cleaning inspection of material before blasting as per QIP
- Performing inspection of Piping, Structure, Welding inspection, Painting, Inspection of fabrication, erection of piping at site
- Conducting final inspection of items while ensuring quality requirements have been achieved
- Monitored and administered the QA/QC Plan; ensured incorporated materials on construction projects are incompliance with the plans and specifications; led a quality team on CPP Project and received appreciation letter from client
- Supervised quality of all manufactured goods; identified defects and the cause of the defect as well as developed a solution
- Planned and directed activities concerned with development, application, and maintenance of quality standards for processes, materials, and products
- Prepared training material and conducted training sessions on quality control activities
- Initiated standards and methods for inspection, testing, and evaluation by utilizing knowledge in engineering fields
- Implemented health & safety awareness programming in accordance with departmental policy; instructed employees on safety standards, precautionary procedures and departmental policies & procedures
-Performed daily inspection and test of the scope while achieving the quality of construction required in the drawings and specifications for all works; ensured activity at the site were as per approved method statement and inspection test plan
- Controlled and monitored all activities related to QualityManagement System; handled QA/QC documents of the entire project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents
- Developed procedures for activities including risk assessment, job safety environmental analysis, Inspection Test Plan and Checklist based on specifications of the project
- Engaged in carrying out Internal Audit at the site as scheduled in the Project Quality Plan
- Coordinated with the Technical Engineer for submission of material submittals to consultant
- Stayed updated with developments in the field, new administrative techniques, legislative issues and other events
- Assisted in the overall planning, organization and management of all aspects of utility operations; provided engineering and technical services to support the construction, installation, repair, and maintenance of utility systems; involved in rectification, replacement of pipes, regulators, valves and meters; distribution system valves, service line valves and their records
- Monitored the fabrication of skid equipment and Installation of skid manufacturing, district regulatory stations DRSs, town border stations (different diameter pipes)
- Engaged in maintaining supply mains, pipeline patrolling, leakage survey, repair of steel pipelines, nondestructive testing of repairs, pipeline leak records, pipeline marking and pressure management (checking and profiling)
- Conducted mobilization of manpower, machinery &equipment’s, handled steel pipe welding activities like welder qualification, joint preparation, pipe in ditch, earth cover, jointing pressure & time, P.E pipe joining
- Established and implemented well-defined emergency & contingency plans; detected gas leakage by complaint
- Supervised the overhead leak survey & rectification; reworked against finding of defective installation till leak was rectified