I am Iqrar Baig, a dedicated and highly motivated Civil Engineer with an Bachelors of Civil Engineering from Mehran university Engineering and technology Jamshoro and Professional Engineer (P.E) from Pakistan Engineering Council Islamabad. Currently, I serve as the Civil Engineer PPS-07 at Shaheed Zulfiqar Ali Bhutto Law University Clifton Karachi at project Construction boys, Girls hostel, Vice Chancellor Residence, faculty Officer Residence, Staff Residence, Masjid and Imam House, Research Institute, Laundry, Communal Block, External and development works etc. project funded by Higher Education Commission, Government of Pakistan with over 17 years of extensive experience in buildings construction projects, My career has been enriched by working on diverse projects with leading Development and International NGOs, as well as UN agencies, under the auspices of renowned donors such as Govt Sector, International Consultants ,Govt Contractors, Donner Agency UN/ DFID /OFDA/ECHO/USAID/INGO's/NGO's Social Sector. To Supervise the Construction work to be carried out under the PC-I.and having Good knowledge of Master Plan ( Architecture, Structural, Electrical, Plumbing drawings) and also Technical specifications, Condition of Contract documents and PPRA -Public Procurement Regulatory Authority and SPPRA-Sindh Public Procurement Regulatory Authority. Assist and advise and Solve technical issues related to building Construction Projects. daily basis monitor the quality of ongoing Construction work done by the local/govt contractors and Checked the quality of construction material as per approved manufacture list at the site, prepared site Memo/inspection reports and Verify running IPC Or Bills with Consultants and Contractors technical Team as per standard Document Bill of Quantities (BOQ), Prepared Daily, Weekly, Monthly, Quarterly reports. Ensure that the project activities are carried out as per approved timelines and Any other task assigned by the Project Director. Possessing a broad range of technical, personal effectiveness, and leadership skills, I use rigorous logic and methods to devise effective solutions to complex problems. My commitment to excellence and my ability to navigate and thrive in challenging environments make me a valuable asset in any project or team.
Project : Construction of Boys and Girls hostel, Research Institutes, Play Ground, Road and Foot Path, Mosque, Vice Chancellor residence, faculty of Officer residence, Staff residence, Communal Block, Laundry area and External and Development works etc...
01-Initiate tendering and bidding process with regard to civil works.
02-Prepare detailed cost estimates for projects, including materials, labor, and other associated costs.
03-Collaborate with architects, engineers, and contractors to establish cost plans and budgets.
04-Evaluate and assess the cost of design options, alterations, and repairs.
05-Monitor and manage project budgets, ensuring that costs remain within approved limits.
06-Track changes in design or construction work to adjust budget projections.
07-Manage and prepare tender documents and contracts.
08-Evaluate tender submissions and negotiate contract terms.
09-Administer contracts, ensuring compliance with terms and conditions, and manage any variations.
10-Measure and value completed work, ensuring payment to contractors and suppliers in accordance with contract terms.
11-Prepare interim valuations, final accounts, and assist in settling any financial disputes.
12-Ensure all work complies with statutory building regulations and quality standards.
13-Any other duty related to civil work projects as assigned from time to time by Dir P&D & DD (Development).
Project: Repair and Maintenance Civil Works DHQ Hospital Okara PK
01-Provide support in the planning, execution, and monitoring of civil engineering projects, assisting senior engineers in project coordination and management activities.
02-Assist in the development and refinement of project designs and specifications, collaborating with senior engineers and other stakeholders to ensure design integrity and compliance with project requirements.
03-Conduct site inspections and assessments to monitor project progress, identify any issues or deviations from plans, and report findings to senior engineering staff for resolution.
04-Assist in implementing quality assurance measures to ensure that civil engineering projects meet design specifications, regulatory requirements, and quality standards, participating in quality control inspections and assessments.
05-Maintain accurate project documentation, including project plans, progress reports, and technical documentation, and assist in preparing reports and presentations for management and stakeholders.
06-Communicate effectively with project stakeholders, including user departments, contractors, and regulatory authorities, providing updates on project status, milestones, and issues as directed by senior engineering staff.
07-Assist in identifying and addressing project-related challenges and issues, working with senior engineers to analyze problems, develop solutions, and implement corrective actions to keep projects on track.
08-Ensure compliance with safety protocols and regulatory requirements at project sites, following established safety procedures and practices to promote a safe working environment for project personnel and stakeholders.
09-Comply with the risk management framework.
10-Participate actively in risk management activities across the organization.
11-Ensure that key risks are identified, reported, recorded and managed in a timely manner.
12-Receive appropriate training in risk management.
Project ; School Construction rehabilitation Programme (SCRP) Humqadam
This position is responsible for ensuring educational infrastructure construction works are completed to programme standards. The position shall monitor and verify the works, providing technical assistance and other capacity building interventions to reduce capacity gaps by interfacing with PTC/SCs, CCSIs, Contractors and School Support Team colleagues.
Duties and Responsibilities
01-Conduct Inspections (26 Minimum per school, based on Milestones and Sub-Milestones). It is MANDATORY to be on site for all major concrete pours (foundations, columns, grade slab, and roof slab/beam) for the entire time of the activity. All Visits to Active Schools (where construction is underway) to be conducted with Contractor Site Engineer. A minimum of 12 Unique School Site visits per week, with accompanying inspections is a basic requirement.
02-All Inspections to include the following information on MIS as applicable:
03-The name(s) of the Contractor Representative, CCSI Members on site for inspection.
04-Observations, related to the particular inspection.
05-The recommendations made in the case of failure and the stipulated time for issues to be addressed (details in MIS and concise version in Site Register).
05-A clearly agreed re-inspection date with the contractor representative.
06-Accurate Photographs related to the specific details in the inspection.
07-All required construction forms to be filled and attached e.g. Contract Variation Orders, Rebar Approval Forms, Material Approval Forms, Source Approvals, Bar bending schedules, concrete test results, non-compliance reports etc.
08-For re-inspections (because of failure of previous inspection or delays), District Engineer will be required to make a specific entry addressing the resolution of the issue.
09-All MAJOR MILESTONE VISITS to require JOINT MEASUREMENTS (with District Engineer & Contractor Engineer together) on site. Please note, this is mandatory and non-compliance will result in the strictest disciplinary
Project : PEFSA- IV Pakistan Emergency Food Security Alliance
01-To carry out Need assessment for all type of CFW/EH activities.
02-Preparation of designs, estimates and Tender documents for all infrastructures related activities
03-Preparation and Submission of purchase requests as per IRC procedures.
04-To conduct trainings regarding operation and maintenance of water supply and sanitation facilities for beneficiaries and Village committees.
05-Liaise and secure consent from the local authorities and beneficiary prior to intervention where applicable.
06-Regular monitoring of ongoing construction activities to ensure that all the activities are executing as per design, specifications and work schedule.
07-Extend all possible technical support to other team members and contractors when and where required.
08-Keep close coordination with sectors through regular meetings.
09-Prepare weekly, monthly work plans and progress reports
10-Preparation of feasibility reports and completion certificates
11-Verify the work done at site and recommend for the payments to contractor(s)/casual laborers etc.
12-Preparation of all the payment documents after verification and submission to supply chain in coordination with supervisor
13-Working in harmony with all other project staff and field team for the effective and efficient day-to-day management of the project in Sindh
14-Prepare technical designs and bills of quantities and ensure that all the construction work is implemented as per approved designs, standards and schedule.
15-Ensure storage and delivery of related materials, equipment, tools and consumables on work site and maintenance of proper records.
16-Coordinate with other stakeholder on the ground for smooth, efficient and effective implementation of the activities.
17-Any other tasks assigned by supervisor
Project: One Room Shelter funded by DFID /OFDA/ECHO-IV
01-Successfully implemented according to quality standards.
02-In collaboration with the programme team and coordination, determine the strategic direction of the program in the short and medium term and map out activities, and contribute to the preparation of project proposals and budgets;
03-Prepare Bills of Quantities and Designs as required by program.
04-Collaborate effectively with other line managers and the coordination team.
05-Manage the program team. Ensure that they are wholly involved in program planning and direction.
06-Collaborate with the Appraisal, Monitoring and Evaluation Unit (AMEU) to assess need, monitor activities, and evaluate program progress. Ensure that lessons learned in the course of implementation are integrated into the program to ensure that it remains responsive and relevant.
07-Provide input and regularly review all FLAT Follow-Up for ongoing program together with the relevant department manager and Program Coordinator.
08-Be alert to opportunities arising for learning, collaboration and partnership that may enhance program quality and responsiveness.
09-Provide relevant technical expertise/guidance to ensure that technical quality and standards are maintained during project implementation.
10-Identify and interact with existing WASH initiatives in the base, including UN, GO’s and NGO’s, and community initiatives.
11-Develop and implement an exit strategy in collaboration with his/her team, AME unit and the Program Coordinator.
12-Liaise with the relevant Technical Working Group / Cluster and its participants/ partners.
13-Report regularly (as requested) to the Area Coordinator and Country Director.
14-Prepare and develop the Project Management tools (i.e. PMF, Log frame).
15-Translate relevant documents or information during coordination visits.
16-.Develop team capacity at both the individual and group level by organizing/ facilitating trainings internally or through specialist agencies / individuals.
Project: Early Recovery Program funded by Japan ,USAID & Rehabilitation and Reconstruction of Sindh flood Govt building funded by ECHO.
Under the direct supervision of the respective UNDP ERP Field Coordinator in Sukkur. He shall be the “supervisory Engineer” of the multiple projects carried over by being implemented by UNDP implementing partners under different contracts and all contracts running concurrently in the province of South Sindh. The Engineer shall liaise regularly with UNDP ERP Field program team and the ER Program Management to ensure smooth support for the project and shall carry out the following tasks and responsibilities.
01-Provide assistance in selection of Implementation Partners (NGOs) and/or construction firms.
02-Participate in the appraisal of project proposals submitted by Implementation Partners and highlight strength / weaknesses in each proposal.
03-Suggestions on improvement of Project proposals.
04-Studying each project at the onset and draft an outline of items that may need attention.
05-Supervising the construction / community based infrastructure works in accordance with the contract documents and using the template and procedure established in agreement between UNDP and contractor/implementing partner.
06-Supervising the works in accordance with the drawings, technical specifications and bills of quantities and ensuring the correct implementation of the works according to technical specifications, to designs and quality of materials.
07-Preparing list of tests required as per the specifications and following up these tests
08-Checking and ensuring that the site is arranged as per agreement all measures are taken for safety of the third party in the vicinity of the site.
09-Review and assess compliance of the work with the Guiding Principles and Minimum Standards for Community Infrastructures.
10-Ensuring that health and safety measures are adopted and followed to the full extent and prepare weekly report and to suggest and instruct additional safety measures if needed.
11-Provide an assessment of any variation to UNDP for approval.
Project: Early Recovery Program and WASH funded by DFID
01-Develop methodology and tools to collect the data for the feasibility assessment of WASH Structures.
02-Conduct field visits and collect the data of the WASH/ CPI structures in close collaboration with targeted communities and community based organizations.
03-Develop the detailed report of the assessed structures and provide recommendations for the feasible structures.
04- Ensure to develop the BOQ well in time and get it validated.
05-Develop the appropriate designs that are locally used and environment friendly.
06-Submission of the material request for the procurement of material and services.
07-Regular follow ups to ensure the procurement process well in time.
08-Technical review of the samples of construction material.
09-Participation in Procurement Committees as the technical person.
10-Ensure that vendor has supplied the material as per the approved samples.
11-Timely delivery of Material and construction at selected locations.
12-Monitoring of the construction work in the field during the commencement of the rehabilitation / rehabilitation work.
13-Ensure that defined quality and quantity is used for the rehabilitation and construction work.
14-Ensure that all the desired material is used for the construction and rehabilitation of CPI schemes as per the approved designs
15- Plan construction activities as per the project plan
16-Ensure that all the schemes should be completed within stipulated time
17-Prepare and submit field visit report including weekly, monthly and scheme completion report
18-Present the completion report of the each scheme
19-Develop and present the detailed report of all the CPI schemes.
20-Ensure that all the documents of the CPI schemes are properly filled and documented.
21-Ensure proper coordination within the base and country team as well as relevant district stakeholders.
22-Any other task assigned by the Supervisor
Project: Water, sanitation and hygiene (WASH)
01-Installation of Hand pumps ( Shallow, Deep ).
02-Pre water Quality tests and Post water Quality tests.
03- Rehabilitation of water Supply Scheme ,Rehabilitation of Ponds.
04- Pour flash, VIP, PIT, ECHCO San latrines Construction with Septic Tank.
05-Bathing Area, Hand washing Device ,Laundry Pads.
06-One room Cement Concrete-block Shelters.
07- Repair Drainage and Sanitation work of Different Camp/school/BHUs
08-Together with partner staff carry on assessment (project assessment and technical assessment and survey (baseline survey and end line survey).
09-Together with partner staff carry out the Selection, design and Construction of water system, using ground water or surface water ,including abstraction, storage, treatment and distribution for new system or rehabilitation of existing systems.
10-Together with partner staff select, design and implement the most appropriate form of sanitation system, in consultation with the beneficiaries, which includes excreta disposal, refuse disposal, vector control and drainage.
11-Together with partner staff select, design and implement the most appropriate shelter, in consultation with the beneficiaries.
12-To Support partner staff develop and executing plan and daily monitoring on implementation activities and report regularly, verbally and in writing, to the line or program Manager.
Project: Community Physical Infrastructure Scheme Funded by PPAF, UNICEF, KPF, Govt of Sindh.
01-Street Pavement /concrete Pavement /Brick masonry /Foot track / Katcha Rural Road.
02-Lift Irrigation systems with lining of water course.
03-Hand pumps (Shallow & Deep ) with Extenuations line.
04-Construction Rural Community RCC Storage Water tanks.
05- Drip Irrigation Systems/ Sprinkle irrigation System.
06- Low cost House (brick masonry wall and roof load bearing structure).
07-Open Drainage and underground Drainage system.
08-Socio – Economic analysis of Rural Communities.
09-Preparation of Pre-feasibility and environmental assessment in conventional schemes.
10-Technical survey and collection of data regarding these Irrigation schemes. i.e (water storage reservoir, lining of water course, land leveling, and micro irrigation schemes such as, Drip irrigation.
11-Preparation of drawings, designs, and cost estimates of conventional Scheme.
12-Execution of technical work, Monitoring and evaluation of above said schemes( Installation of tube wells, Drip irrigation, Sprinkle irrigation ,Lining of water courses, Storage water reservoir
Project : Community Physical Infrastructure Scheme Funded by PPAF,UNICEF
01-Street Pavement /concrete Pavement/ Brick masonry.
02- Construction of Rural Community RCC Storage Water tanks.
03-Lift Irrigation systems with Drip Irrigation System, Sprinkle irrigation.
04-Hand pumps ( Shallow & Deep ) with Extenuation line.
05-Open Drainage and under ground Drainage system.
06-Water storage reservoir and Lining of water course.
07-Socio – Economic analysis of Rural Communities.
08- Preparation of Pre-feasibility and environmental assessment in conventional schemes.
09-Technical survey and collection of data regarding these Irrigation schemes. i.e ( water storage reservoir, lining of water course, land leveling, micro irrigation schemes such as , Drip irrigation.
10-Preparation of drawings, designs, and cost estimates of conventional Scheme.
11-Execution of technical work, Monitoring and evaluation of above said schemes (Installation of tube wells, Drip irrigation, Sprinkle irrigation, Lining of water courses, Storage water reservoir.