Curretly working as Operation Engineer @ Lucky Electric Power Company Limited also completed six months training on coal fired power plant at Quaingshi, China . Have 12 years multi-disciplinary experience, I am seeking for an opportunity in Management cadre in Operation, Power Plant, Power Generation, Power Transmission, Electrical Operation, SBO or Engineering Section. I believe myself sincere, hard worker and committed to work that supports positive approach in my carrier, having engineering background with multidisciplinary experience in NGOs and corporation with better experience on (Management,Procurement, Documention, Engineering, Planning, Monitoring, Trainings,Team Leading & Making strategies)Â
· Commissioningactivitiesofelectricalequipment's
· Discussion,Comments,remarksonSLDs,P&IDs,PlantAuxiliaries,
· Generators-transformerunitprotections,Lineprotections
· Relaytesting,protectionsetting,Transformertesting
· ConductorsLaying,Dampers,wavetrappersconnections
· Preparingoperationticketsforsmoothoperationofequipment
· Developingisolationorderforms&Certificates
· PPA8.2Tests(Opencircuit,Shortcircuit,impedancetest)
· PPA8.3Tests(RRT,Overspee,Heatrate,Overvoltage,V/HZ,Loadrejectionreactivecapability,minimumvoltagecapacityetc.)
· 500kVline&BusBarenergization&denergization
· CommunicatewithNPCC
· EnergyManagement(DAC,RDAC(Up/Down),DailyEventsheets,GenerationSheet,SpotLoad,peakHoursandotherdocumentsaspernationalgridrequirement(commercialactivities)
· 500kvto11KVSST,22KVto11KVAuxtransformers&22KVto500KVMT
· Generator,Transformerprotections(Relayrooms,ProtectionLinksetc.)
· SLD&Bay/DiaCompletion(2/3Scheme)&Shuntreactorstation.
· Maintransformer,AuxiliaryTransformer&SSTtheiroperation&control.BucholzRelay,SilicaGel,TopOil,WindingTemperature,Surfacetank,ConservativeTanketc.SergiSystem,Nitrogenprotection,Autoprotection.
· GISSwitchgearInternaldiagram&itsconnections,(CBS,Isolators,Line,EarthingSwitches,SF6)transmissionmechanism.
· CT,PT,CCVT,lighteningarrestor,surgearrestortheirfunctions&mechanismSwitchingMechanism,InterlockingMechanism,ExcitationProcess,mainpowerSupplyandauxiliarysupply,
· HV/LVDistributionrooms,PC,MCC,Localcontrolcabinetsoperation,OperationofACB,VCB,MCB,ELCB,SF6&othercircuitbreakers
As an Operation Engineer My responsblities are:
NCS & DCS Control
500 Kv incoming Line, grid construction, switching mechanism, strings, CT & PT (CVT & CCVT), Lightening arrestor/ Surge arrestors.
Energization and denergization of main 500Kv line as per need
Regular communication with NPCC for smooth operation of system
Synchronization Process, Excitation transformer, Generator, Hydrogen system
Many times successful Synchronized with national grid
Gas Insulated System (GIS), Bus bar, SF6 indicators, Circuit Breakers, Isolators, Earthing Switches, Shunt reactor (all of their parameters)
Startup/Standby Transformer, Step-up Transformer, Auxiliary Transformer
500 to 6kv Startup Standby transformer, 20 to 6kv auxiliary transformer, 20 to 500kv step up transformer,
Sergi System (Transformer Protection), nitrogen Systems, Auto protection Transformers Parameters ( oil temp, winding temp) cooling mechanism
Current, voltage, active power, reactive power, power factor
Protectio n panels, Networking, Communication Panels
AC/DC Power Supply, Common UPS System, Battery Bank Mechanism,
Frist incoming power, second incoming power, all load distribution
Energization/ denergization of 6kv & 400v Circuit Breakers, Remote/Local Switching Control
Power On/Power Off Circuit breakers and tagging
6kv load Distribution, 6kv to 400v (HV to LV Side of Transformer)
400V Load distribution, its operation
PC to MCC Power distribution, MCC load distribution
Switching Mechanism, Interlocking Mechanism.
Completed six (06) months training at Quaingshing coal fired power plant @ China, where i learn about operation and maintenance of 2x330MW Coal fired power plant. which includes,
Class training and on site training for the complete operation of coal fired power plant (Boiler, turbine, coal, chemical, ash and electrical systems)
Chemical water treatment and Condensing polishing plant process in power plant
Measurement and instrumentation of all equipment’s and their efficiency
Gas Insulation System, CB, Isolators, PT, CT, arrestors etc
Power Production, Synchronization & Desynchronization with Grid
Responsible for overall District level CPI interventions
Manage a team of 4 taluka level engineers
Design, Drawing, Estimate and approve projects
Monitoring of ongoing projects
Participate in Govt and other liaison department meetings
Present Project status in management meetings
Communication with donors for easy understanding & smooth operation
Prepare weekly, monthly, Quarterly and annually reports
Initiation & completion of projects within agreed deadlines
Overall responsible for WASH related CPI interventions
Implemention of water provision hygiene promoting facilities
Design new schemes with justification to Donor agencies
 Develop Mechanism for CFW, SLF through Mobicash
Establish procurement plan, bid process, evaluation of vendors, award contrac
 Installation of Solar water pumps and other water related projects
Providing technical assistance for smooth operation
Attend regular management meetings, share ideas and make strategies
Communication with donors for easy understanding & smooth operatio
Prepare weekly, monthly, Quarterly and annually reports
Initiation & completion of projects within agreed deadlines
Good knowledge regarding M&E Reports, CFW, SFL etc
This project concerned with repair, renovation & rehabilitation of schemes
Renovation of existing CPI schemes
Initiation & completion of projects within agreed deadlines
Provision of Solar Light and Solar Pump schemes
Monitoring of all ongoing projects
Attend regular management meetings, share ideas and make strategies
Communication with donors for easy understanding & smooth operation
Prepare weekly, monthly, Quarterly and annually reports
Responsible for manging all solar related projects
Design, Drawing and Estimate project proposals
Installation of Solar Home systems and solar street lights
Managing a team of 140 technician at a time
Coordination with Vendor for smooth and timely execution of project
Manage Supply of goods, logistic and transportation till sites
Coordination with Vendor for smooth and timely execution of project
Communication with donors for easy understanding & smooth operation
Present new ideas regarding possible solar intervention
Responsible for proper installation & commissioning of solar projects
Leading a team of technicians required as per project need (max 200 technicians
During this tenure i remain responsible for initiation of Solar projects
Innitiated solar lanterns, Solar Home systems and solar pumps
Innitiation and completion of projects within deadline
Awarness in community regarding CPI intervention
Monitoring of all ongoing projects
Prepare weekly, monthly, Quarterly and annually reportsschemes.