B.Sc. Electrical Engineering in 2012.
M.S in Project Management in 2017.
12 years of professional experience in Hydro and Solar Power Plants.
Currently, working as a Country Head - Techno Commercial to lead design department, operations department and procurement department.
Responsible for overall Project Management, PPA Agreements, Cost Management, Time Management, Reporting and Meetings with Stakeholders.
Projects: (PPA and C&I Solar Projects)
C & I Solar Projects: 100kWp to 10 MWp.
PPA Solar Projects: 300kWp to 10 MWp.
Responsible for overall Project Management, execution, designing, procurement, cost Management, Time Management, Reporting and Meetings with Clients and Vendors.
Projects: (EPC and Tender & Bidding Solar Projects).
1). 4.0 MWp Solar Power Plant at Shabir Tiles. Plant Capacity: 4.0 MWp - On grid Hybrid system.
2). 1.25 MWp Solar Power Plant at GIKI University Swabi. Plant Capacity: 1.25 MWp - ON Grid Hybrid system.
3). 2 MWp FFC Rahim Yaar Khan. Plant Capacity: 2.0 MWp - ON Grid System.
4). 100 MI Residential Houses. Plant Capacity: 540 kWp - ON Grid System.
5). 200kWp Air University Islamabad. Plant Capacity: 200 kWp - ON Grid Systems
Responsible for overall Project Management, Operations, designing, Reporting and Meetings with Clients and Vendors.
Projects: (Pakistan Government Solar Projects)
1). Solar Mini Grids in Merged Areas of KPK Pakistan Plant Capacity: 2.60 MWp Off-Grid Hybrid system.
2). 6 District Head Quarter Hospitals in Merged Areas of KPK Pakistan Plant Capacity: 500 kWp off Grid Hybrid system.
3). 10 Basic Health Units and RHCs in KPK Pakistan Plant Capacity: 600 kWp off Grid Hybrid system (50kWp each).
4). Solar Pumping System of (2 HP to 50 HP) in KPK Pakistan. Plant Capacity: (2 HP to 50 HP).
5). Active Solar Tracking Systems (1P and 2P) in KPK Pakistan. Plant Capacity: (40KW to 300KW).
• Survey, Site Identification & Data Collection.
• Feasibility Reports.
• Selection of Turbine Generator Sets and other Electro-Mechanical Equipments.
• Design and Cost Estimation of Micro, Mini & Small Hydro Power Projects.
• Installation of Turbine Generator Sets and other Electro-Mechanical Equipments.
• Transmission and Distribution.
• Testing & Commissioning.
• Operation and Maintenance of Plant.
• Responsible of billing system of Community.
• Operators Training.
• Correspondence with vendors and suppliers.
• Supervision of Logistics.
• Coordination with Village Organization and SRSP.
• Supervision and monitoring of erection/installation, testing and commissioning of all Electrical & Mechanical equipments.
• Check /inspect the consignment, materials, parts, and equipments prior to installation.
• Supervision of all electrical work in pressure channel, diversion tunnel & power house.
• Overview drawings as per site requirements.
• Prepare daily, weekly and monthly progress reports of all activities.
• At 500KV grid station i have worked with operation and maintenance staff to learn about grid Equipments and attended power transformer testing, general Structure of Grid Station.
• Current Transformer Potential Transformer, Circuit Breaker and Lightening Arrestor.
• Three Phase Power Transformer and Capacitor Bank.
• Differential, Distance, Over Current and Over Voltage Relay.