Electrical engineer working as a project manager at Egas pvt ltd. Direct and overseeing project for Egas pvt ltd., Total Parco pakistan and Washtec Germany. Designing site based electrical systems, directing electrical contractors, resolving electrical design and site based issues, developing cost estimates, managing schedules for installation, errection, maintenance and troubleshooting of the machines. Handling teams to meet the given deadlines, monitoring HSE for zero fatal accidents on site.
Coordinating with total parco and washtec for the completion of projects on time within budget and withink scope. Overseeing agreements and contracts. Setting deadlines for the team, assigning responsibilites and monitor and summarize progress of the project.
Site electrical engineer for washtec germany & total parco pakistan project. Installing and comissioning SoftcarePro classic SM10C rollover car wash system for commercial use. Handling logistics for the equipment and chemicals. Ensuring smooth installation of the system while maintaining Total Parco safety and equipment handling protocols. Commissioning and handing over the machine to total parco with on site staff training.
Designing and Executing site based electrical design. Installation and comissioning of 160kW 750 natural gas compressors. Designing and installing LT/HT panels. Overseeing site based needs. Handling budget for proper execution of the tasks. Directing contractors and teams to meet deadlines. Following proper HSE SOPs for zero fatal accidents on site. Ensuring reliable power distribution for 24/7 operation.
-- Hallini Gas Compression Field
-- Dhok Sultan Gas Compression Field
-- Ratana Gas Compression Field
Working in Advance System Rebuild Factory to be in team to develop a Temperature controlled fan which operates when the chip exceeds a specific temperature.