Seeking a position in a professional organization which enables me to demonstrate my
competitive capabilities and utilize my strong technical & analytical skills for mutual benefits.
Dawood Engineering Pvt.Ltd | Hub |
Senior Technical Officer
Dept: PPC / Material Preparation Section (Production)
Oversee the different production processes (Production Planning & Materials Preparation Section).
Planning and arranging the production schedule and it’s related resources. Utilizing needed human
and material resources in MPS. Creating a timescale for production while meeting production
deadline.
Core Responsibilities:
-To design the programme of laser cutting machine and working as a production Engineer.
- To prepare and oversee the monthly production plan and material preparation at MPS
-To prepare monthly plan of materials and other resources required for production.
- To optimize the material through different techniques.
AGC-Panasonic | Karachi | Apr 2018 –July 2018
Trainee Mechatronics Engineer,
Core Responsibilities:
- Commissioning of robots and mechanical jigs &fixtures.
-Programming of robot according to part and process ergonomics
- Research and development of solution for manufacturing industry using robotic technology
Internee Mechatronics Engineer, Universal Brushwares Pvt.
- Contributed in Maintenance Department under the supervision of Incharge
-Mechanical Maintenance
- Troubleshooting of Assembly line
- Contributed in Maintenance of Nailing Machine
- Follow up all the Machines and Maintain records
- Update all the Inventory of Electrical and Mechanical Maintenance
Jul 2016 -Jan 2017 Intern, Dawlance Pvt | Karachi |
Contributed in Maintenance Department under the supervision of Deputy Manager
Learning included detailed understanding of Machines related to Injection Molding, Extrusion,
Foaming, Thermoforming, Painting, Assembly line and Metal forming Processes.
Mechanical&Electrical Maintenance
Inspections of Machines& Preventive Maintenance
Troubleshooting of Machine Faults& corrective Maintenance
Maintenance of pneumatic, Hydraulic and heating/cooling systems
Working On PLC’s
Plant Engineering
Worked On AutoCAD for updating and verifying Factory layouts
Contributed in Company Project (Assembly line)
Assisted in documentation work of Plant Engineering Departments