Highly skilled Land Surveyor with over 15 years of experience in construction, infrastructure, and hydroelectric projects. Extensive expertise in operating surveying instruments and CAD software to deliver accurate survey data. Proven ability to coordinate with engineering teams, ensure project compliance, and support large-scale infrastructure projects.
The K-IV Water Project is a significant infrastructure initiative aimed at addressing the growing water needs of Karachi, Pakistan's largest city. It is a joint effort between the federal and provincial governments to augment the city's daily water supply and alleviate its water scarcity issues.
Water Source:
The water for the project is sourced from Keenjhar Lake, one of the largest freshwater lakes in Sindh, which is situated approximately 120 kilometers from Karachi.
Water Supply Capacity:
The K-IV project aims to supply 650 million gallons of water daily to Karachi, which is critical to meet the water demand of the city’s population, especially in the face of frequent water shortages.
Transportation Infrastructure:
Water will be transported through three primary canals. These canals will play a key role in transporting water from the lake to Karachi, where it will be processed and distributed.
Project Phases:
The project is divided into multiple phases. The first phase is expected to focus on increasing the water supply to Karachi by around 260 million gallons per day, with subsequent phases ramping up the capacity to meet the full target.
Project Components:
Pumping Stations: These will be set up at Keenjhar Lake and along the canals to ensure a continuous flow of water.
Water Treatment Plants: The water extracted from the lake will undergo treatment to ensure its quality before being distributed to residents of Karachi.
Transmission Lines and Canals: The water will be transferred through a network of canals, pipes, and pumping stations. The transmission network will be designed to efficiently handle the large volume of water.
Technological and Engineering Supervision:
The detailed design and supervision of the project have been entrusted to Techno Consult International Pvt. Ltd., a well-regarded firm that specializes in providing consulting services for large-scale water supply and infrastructure projects. Techno Consult International will ensure the technical feasibility, safety, and sustainability of the project. The firm will also oversee the implementation of various stages to ensure the project is completed on time and meets required standards.
Environmental and Social Impact:
Given the scale of the project, environmental and social considerations are critical. Environmental impact assessments (EIAs) and studies will be conducted to mitigate any negative effects on the surrounding ecosystems and communities. Measures will be taken to ensure that the extraction of water does not adversely affect the lake’s environment.