I found interest in the construction field. I made model houses with mud and snow
in my childhood. I started my career to jump into the civil engineering. Its seems really interesting to do inspection of the material, check the quality, working on the design process, learning the phase of execution. So, i found myself passionate in this field to look over the field of project.
Record & report actual progress against target programme
Prepare working programmes in consultation with site supervision
Prepared technical reports, Report on subcontract progress to Senior Planners
Observed safety requirements
Regular progress recording on site of actual progress
My success relates to become a Project manager and planning engineer. I would love to be a part of such skilled companies.I would like to drop my C.V in session with upcoming demands and will wait for the positive remarks.
Thanks for giving attention towards my summary.
·Inspection of site villas for Abu Dhabi municipality approval
·Check the villa steel foundation, slab and stone block as per drawings and specifications
·Own sites inspection and execution work too
·Manage all the supervisor and labor for villas construction
·Execution of villa Substructure and superstructure including the supervision of Finishing work ceramic, interlock, doors aluminum window and stair railings too
·Inspection of Waterproofing works for washroom and use of plaster, bitumen, primer, stucco filler and dry mix quality work test too.
·At least four hangers for the stone work on the facade of building and use of bitumen before fixing stone and marble.
·Utilize the resources as per requirements with quick decisions on sites
I have been started working on the G+4 building of 8 plaza. I have dealt with the planning and finishing work of 4 plaza.
I monitored and executed the plastering work, Glass work, façade granite, lowering, ducts, lightwell, paint, door filling, marble, Desktop Board etc.
worked on Primavira to manage all the activates as per schedule
Work Break Down structure made and reporting is done on primavira to manage the baseline schedule
Leading to play a role for the execution of total 120 lifts and lift volume is 6*6*74
-Marking of Finish Floor Level
-Clearance of Well
-Dewatering and Removal of Debris
-Scaffolding operations in the lift
-Surface preparation
-Cutting of concrete and through rods
Ensure to provide them safe and clear platform to start mechanical work.
- Coordinated with the mechanical team to complete the lift within9 days
Control Panel Base Filling for box fitting of Electrical Work
-Layout marking of light poles
- Supervise the covered drain according to drawings and steel specifications
Calculate the Bar bending schedule of covered drain
Project : Orange Line Metro train Lahore , Pakistan
Managing parts of construction projects
Examine and draft site reports and designs
Overseeing building work
Undertaking surveys
Preparing site reports and other paper filling work
Supervising contracted staff
Ensuring projects meet agreed specifications and budgets
Provide technical advice and solving problems on site
Checking the drawing to ensure that they are following correctly